Emlékérem a Temze-alagút átadására a tervező Sir Isambard Marc Brunel (1769-1849) képmásával
Round memorial medal issued on occasion of the inauguration of the Thames Tunnel in 1842. On the recto: designing engineer Sir Isambard Marc Brunel's portrait. On the verso: depiction of the Rotherhithe Tunnel under the Thames. English description under the picture. "THAMES TUNNEL 1200 FEET LONG / COMMENCED 1824 COMPLETED 1842 / 76 FEET BELOW HIGH WATER / COST L 450000. / SIR.I.M.BRUNEL ENGINEER".
Cruthaitheoir
- Joseph Davis (?-1857)
Ábhar
Cineál míre
- kép
Meánach
- http://vocab.getty.edu/aat/300133748
- Stán
Cruthaitheoir
- Joseph Davis (?-1857)
Ábhar
Cineál míre
- kép
Meánach
- http://vocab.getty.edu/aat/300133748
- Stán
Institiúidí soláthartha
Comhbhailitheoir
Ráiteas um Chearta Ceadúnas do na meáin sa mhír seo (mura sonraítear a mhalairt)
- http://creativecommons.org/licenses/by-nc-nd/4.0/
Cearta
- research permit needed
Ama
- 1842
- 1842
Áiteanna
- Birmingham
Foinse
- Piarista Múzeum
- Budapest
Aitheantóir
- Inventory number 2016.840.1.P
- 736170
Meid
- 4,4 x 4,4 cm
Formáid
- http://vocab.getty.edu/aat/300252261
Teanga
- ZXX
- zxx
Bliain
- 1842
Tír sholáthair
- Hungary
Ainm bailiúcháin
Ar fáil den chéad uair ar Europeana
- 2025-04-24T17:05:52.603Z
An uair dheireanach a nuashonraíodh ón institiúid sholáthartha
- 2025-04-24T17:05:52.603Z